Keeping your requirements in focus – our site is becoming renewable
Whoever produces, knows the challenges: becoming more efficient, reducing emissions, delivering reliably. We start with ourselves and systematically convert our site in Königsbach. Specifically: photovoltaics 79.98 kWp, complete conversion to heat pumps, ~160 mm roof insulation, as well as 11 kW charging stations with provision for more. By 2027, we will reach 100% renewable energy on balance – with our own PV and a switch to green power.
- PV 79.98 kWp
- Yield ≈ 80,000 kWh/year
- Heating 3 HP ≈ 38 kWth each
- Storage 4×1,000 l
- Heating rods 4×3 kW
- Roof insulation ≈ 160 mm
- Charging points 2×11 kW (+2)

Implementation at a glance
- Electricity:
- The PV system (172 modules at 465 Wp, module output ~23%) provides approx. 80,000 kWh/year.
- Connection possibility for battery storage prepared.
- Heating:
- 3 heat pumps (≈38 kWth) supply the building.
- 4 × 1.000 l buffer stores heat.
- 4 × 3 kW heating elements provide backup on very cold days or during PV peaks.
- The step-by-step replacement of the oil heating system has been implemented – centrally for efficiency.
- Building insulation:
- 642 m² roof area insulated.
- ~160 mm insulation thickness.
- Exact savings are difficult to quantify here, but we conservatively estimate ~10% for this area.
- Mobility:
- 2 x 11 kW charging stations installed, PV-controlled.
- Provision for two more already prepared.
- This already enables the local CO₂-free operation of a vehicle fleet.
Already implemented in 2025
- Roof & PV: Start February, completed end of April – completed.
- Heating & distribution: Oil heating replaced – completed.
- Conversion and installation of heat pumps: Mid-September – completed.
Expected effect (on balance):
- PV yield ≈ 80,000 kWh/year.
- Replacement of approx. 28,000 l heating oil/year (fossil fuel).
- The high average COP of 3.5 enables the balanced operation of the heat pumps through the PV system.
Milestones by 2027
- 2024: Finalization and planning of necessary steps.
- 2025: Roof + PV in operation, heat pumps installed, charging stations active.
- 2026: Storage regulation reinstalled, PV-optimized charging stations expanded.
- 2027: Conversion to green electricity – together with our own PV, this achieves 100% renewable energy on balance for electricity and heat at the site.

In short
Clear steps, transparent figures, defined goals – we keep progress visible at all times.